Fiscal Years 2020-2023 Transportation Improvement Program

#Reload the page Map

Program Summary

As part of the metropolitan planning requirements, the Johnson City MTPO develops and regularly updates a Transportation Improvement Program (TIP). The purpose of the TIP is to identify and program all transportation projects within the Johnson City MPA that are funded by federal programs in Titles 23 (Highways) and 49 (Transportation) of the USC. The TIP is cooperatively developed at least every four (4) years by the Johnson City MTPO administrative staff in conjunction with its member jurisdictions, Tennessee Department of Transportation (TDOT), Federal Highway Administration (FHWA), Federal Transit Administration (FTA) and Johnson City Transit (JCT). The TIP is included by reference in the Statewide Transportation Improvement Program (STIP) and adopted by the Johnson City MTPO Executive Board and the Governor of the State of Tennessee. The TIP contains all federally funded and regionally significant locally funded projects. The TIP includes proposed federally funded capital and non-capital surface transportation projects or project phases.

Once a draft TIP is completed, it is submitted to TDOT, FHWA, and FTA for comments. Once the comments have been adequately addressed, the TIP follows the process described in the Public Participation Plan to provide public notice and an opportunity for the public to comment. Once any public comments are addressed, the TIP is recommended for adoption by the Johnson City MTPO Executive Board. Then, the final TIP is forwarded to TDOT to be included by reference in the STIP and approved by FHWA and FTA.

$58,292,765.00 26
$40,427,846.00 12/20/2019
$21,817,896.22 10/1/2019 through 9/30/2023
$18,609,949.78 12/8/2020
* Obligations during current TIP period only. Glenn Berry, glennberry@jcmpo.org

Project List

Search for projects by keyword:    

25 projects meet the search criteria:

TIP ID#Project NameImprovementLocationLead AgencyTotal Cost
2014-01Elk Avenue Bridge RepairMBridge ReplacementCarter CountyElizabethton$1,506,073.00
2017-01SR 67/91/US 321 at SR 37/US 19E Traffic Signal UpgradeMSignal UpgradesCarter CountyElizabethton$772,000.00
2017-02SR 34 at Industrial Park Rd Traffic Signal UpgradeMSignal UpgradesSullivan CountyBluff City$625,000.00
2017-14Traffic Signal for State of Franklin Rd and Harris DriveMSignalizationWashington CountyTDOT$475,000.00
2090565Surface Transportation Program GroupingMRoad UpgradesMulti-CountyTDOT$7,440,000.00
2090595Safety GroupingMSafetyMulti-CountyTDOT$3,767,500.00
2090560National Highway System Infrastructure GroupingMInterstate MaintenanceMulti-CountyTDOT$980,000.00
2010010State Route (SR) 91 ExtensionMReconstructionCarter CountyTDOT$16,447,000.00
2020-01JCT Transit Operating - Sec. 5307MTransit OperationsMulti-CountyJohnson City Transit$13,535,819.00
2020-02JCT Capital - Sec. 5307MTransit CapitalMulti-CountyJohnson City Transit$1,291,500.00
Show # of items:

List of Proposed Amendments

No proposed amendments available

Reports & Tables

Report Name Description
bullet Custom Project List Report Print or export a detailed list of all or selected projects
bullet Project Information Sheets Print or export detailed information about individual projects
bullet Funding Summary by Program Year and Grant Source View current balances of programmed funds by year and grant
Request another type of report Send us your request

Related Documents and Links

There are no files or links found for this TIP.

List of Amendments

Amendment #TIP ID#ProjectActionMPO AdoptionTDOTFederal
12017-02SR 34 at Industrial Park Rd Traffic Signal UpgradeAmended to move the CONST Phase from FY 2020 to FY 2021 and add an additional $235,000 (Federal), for a new total of $415,000.12/08/202012/10/202012/10/2020
22020-04JCT Operating - Sec. 5317 New FreedomAmended to add $241,512 ($120,753 federal, $60,378 state and $60,378 local) to FY 2022 and $241,512 ($120,753 federal, $60,378 state and $60,378 local) to FY 2023 in residual Section 5317 New Freedom funds redistributed by TDOT to Johnson City Transit.4/27/20216/15/20216/22/2021
32020-10NET Trans Capital ProjectAmended to add Section 5339 funds for a total of $57,325 ($45,860 federal, $5,732 state and $5,733 local).4/27/20216/15/20216/22/2021
42022-01Downtown Johnson City Crosswalk Safety ProjectAmended to add a new project to improve pedestrian safety at crosswalks in downtown Johnson City for a total of $1,000,000 in Fiscal Year 202212/08/202112/09/202112/30/2021
52022-02Johnson City Traffic Signal GroupingAmended to add a new project to install traffic signals in various locations in Johnson City to increase safety for a total of $2,375,000 in Fiscal Year 202212/08/202112/09/202112/30/2021
62022-03NET Trans Capital Projects (5307)Amendment 6 - NET Trans is adding a new capital project with a total of $102,859 ($82,287 Federal, $10,286 State and $10,286 Local) in FTA Section 5307 funding.6/21/20227/05/20227/14/2022

List of Administrative Modifications

Adjustment #TIP ID#ProjectActionMPO Approval
12017-14Traffic Signal for State of Franklin Rd and Harris DriveModified to add an additional $120,000 in STBG-M funds for Construction.12/30/2019
102090015SR-XXX (Knob Creek Rd)Modified for TDOT to move PE-N and PE-D from FY 2022 to FY 2023.8/11/2020
112017-21Elizabethton ADA Transition PlanModified to add an additional $20,000 ($16,000 Federal and $4,000 Local) to the Planning phase of the Elizabethton ADA Transition Plan to assist with additional sidewalk evaluations.9/15/2020
122017-02SR 34 at Industrial Park Rd Traffic Signal UpgradeModified to add an additional $67,000 for PE-NEPA phase in FY 2021 (100% federal). Also, modified to add an additional $5,000 for PE-Design phase in FY 2021 (100% federal). Please see notes for previous PE obligations.12/15/2020
132014-01Elk Avenue Bridge RepairModified to add an additional $445,677 total ($356,542 Federal and $89,135 Local) for CONST in FY 2021.1/22/2021
142090565Surface Transportation Program GroupingModified because TDOT is adding $1,760,000 ($1,408,000 federal and $352,000 state) to FY 2021.1/27/2021
152017-02SR 34 at Industrial Park Rd Traffic Signal UpgradeModified to add an additional $92,000 total (100% federal) to the CONST Phase in FY 2021.2/23/2021
162014-01Elk Avenue Bridge RepairModified to add an additional $78,000 total ($62,400 federal and $15,600 local) to the PE-NEPA phase in FY 2021, which was previously obligated in 2017.2/24/2021
172017-02SR 34 at Industrial Park Rd Traffic Signal UpgradeModified to add an additional $26,000 for CONST in FY 2021.4/06/2021
182020-07NET Trans Operating ExpensesModified to add an additional $284,458 in Section 5307 funds ($142,229 in Federal Funds (50%) and $142,229 in Local Funds (50%) in FY 2021 for operating. 4/07/2021


Name the search:
OR

For example: "roadways 2016", "MPO construction projects"

Replace an existing search:

Updates the selected search with the current search criteria.

InfoYour saved searches are available on the My View tab.