TIP Project #2017-02: SR 34 at Industrial Park Rd Traffic Signal Upgrade

Upgrade and install traffic signal at intersection of SR-34 (US-11E/19W) and Industrial Park Road to improve safety and congestion, such as, mast arms, emergency pre-emption devices, advanced traffic controls, etc.

M Signal Upgrades Regional Plan ID: TSM, page 5-26
Bluff City TDOT PIN: 127426.00
Sullivan County Total Cost: $625,000.00
SR034 (Bristol Hwy) Total Programmed: $613,000.00
Intersection of SR034 (US 11E/19W) at Industrial Park Rd Federal Share: $613,000.00
0.00 miles Federal Obligation*: $671,173.76
Attainment Unobligated Balance: ($58,173.76)
* Obligations during current TIP period only.

Programmed Funds

Fiscal YearPhaseFunding SourceTotal FundsFederal FundsState FundsLocal Funds
2020PE- DesignSTBG-M$8,000.00$8,000.00$0.00$0.00
2021ConstructionSTBG-M$533,000.00$533,000.00$0.00$0.00
2021PE- NEPASTBG-M$67,000.00$67,000.00$0.00$0.00
2021PE- DesignSTBG-M$5,000.00$5,000.00$0.00$0.00
TOTAL  $613,000.00$613,000.00$0.00$0.00

Construction Reserve Funds

There is no reserve funding information for this TIP Project.

Obligated Funds

Obligation DatePhaseFunding SourceFederal FundsNotes
7/23/2018AUTHORIZE PE-NSTBG-M$12,000.00(Bristol Hwy, US-11E/19W), Intersection at Industrial Park Road, LM 2.966 in Bluff City
12/2/2019AUTHORIZE PE-DSTBG-M$8,000.00(Bristol Hwy, US-11E/19W), Intersection at Industrial Park Road, LM 2.966 in Bluff City
12/22/2020ADJUST PE-N & PE-D; AUTHORIZE CONSTSTBG-M$472,000.00(Bristol Hwy, US-11E/19W), Intersection at Industrial Park Road, LM 2.966 in Bluff City
4/27/2021ADJUST CONSTSTBG-M$120,231.00(Bristol Hwy, US-11E/19W), Intersection at Industrial Park Road, LM 2.966 in Bluff City
8/9/2022CLOSE PROJECTSTBG-M$58,942.76(Bristol Hwy, US-11E/19W), Intersection at Industrial Park Road, LM 2.966 in Bluff City
TOTAL  $671,173.76 

Project Images and Videos

Bluff City SR 34 Signal

Project Documents and Links

There are no documents or links for this TIP Project.

Project Notes

NotePosted On
PE-N, PE-D and CONST in the amount of $472,000 Federal was obligated 12/22/2020.4/06/2021
PE-D in the amount of $8,000 Federal was obligated 12/2/2019.10/19/2020
PE-N in the amount of $12,000 Federal was obligated 7/23/2018.10/19/2020

Project Amendments

Amendment #ActionMPO ApprovalTDOT ApprovalUS DOT Approval
1Amended to move the CONST Phase from FY 2020 to FY 2021 and add an additional $235,000 (Federal), for a new total of $415,000.12/08/202012/10/202012/10/2020

Administrative Modifications

Adjustment #ActionMPO Approval
12Modified to add an additional $67,000 for PE-NEPA phase in FY 2021 (100% federal). Also, modified to add an additional $5,000 for PE-Design phase in FY 2021 (100% federal). Please see notes for previous PE obligations.12/15/2020
15Modified to add an additional $92,000 total (100% federal) to the CONST Phase in FY 2021.2/23/2021
17Modified to add an additional $26,000 for CONST in FY 2021.4/06/2021

Submit a Comment